Skip to product information
1 of 7

Rollerblade

Rollerblade Lightning Men's Urban Inline Skate, Black and Lime

Rollerblade Lightning Men's Urban Inline Skate, Black and Lime

Regular price $162.18
Regular price $216.24 Sale price $162.18
Sale Sold out
Shipping calculated at checkout.
Quantity

Rollerblade Lightning Men's Urban Inline Skate, Black and Lime

Brand: Rollerblade

Color: Black/White

Features:

  • A SKATE FOR ALL TYPES OF SKATERS - Urban, fitness, commuting and recreational skaters wanting a very versatile product. This skate has upgraded fit features and performance, support and style with the sublimated liner.
  • MEMORY BUCKLE CLOSURE SYSTEM - with additional lacing are easy to use. The buckles are micro adjustable and have additional connection points inside the skate to get a custom, precise fit.
  • MOLDED SHELL SUPPORT WITH VENTILATION - support for all types of skating, enhances power transfer and a locked in feel. This, in combination with the ventilation, keeps your feet cooler on those hot days.
  • PADDED LINER with SHOCK ABSORBER & FOOTBOARD SIZER - Provides superior comfort with anatomical design, fit and sublimated liner. The Footboard sizer allows you to creates a snug fit or remove it to make more room in the skate. The heel shock absorber provides great vibration dampening while skating.
  • ROLLERBLADE URBAN 80mm/85A WHEELS and SG7 bearings optimize grip, maneuverability and speed while adding stability with its 243mm extruded aluminum frame and racing axles.

Release Date: 15-02-2024

model number: 073726001A1

Part Number: 073726001A1

Details: The Lightning is for anyone looking for a comfortable molded skate. Whether touring a city, doing a few laps around the park, or skating for fun, this skate is super versatile and is easy to use with simple closure and memory buckles. The Footboard Sizer provides two sizes in one skate. It enables skaters to insert the Footboard under the insole to create a snugger, more performance fit or remove it to accommodate the bigger size for more room in their skates. The Lightning is the perfect everyday inline skate built with molded shell construction and equipped with our 243mm aluminum frame, 80mm wheels and SG7 bearings. Built on the pillars of support, comfort and versatility, the Lightning will elevate your skating.

EAN: 0888341987132

Package Dimensions: 23.2 x 15.8 x 6.0 inches

View full details