Skip to product information
1 of 7

Rollerblade

Rollerblade Lightning 90 Men's Urban Inline Skate, Anthracite and Taupe

Rollerblade Lightning 90 Men's Urban Inline Skate, Anthracite and Taupe

Regular price $209.25
Regular price $279.00 Sale price $209.25
Sale Sold out
Shipping calculated at checkout.
Quantity

Rollerblade Lightning 90 Men's Urban Inline Skate, Anthracite and Taupe

Brand: Rollerblade

Color: Anthracite/Taupe

Features:

  • A SKATE FOR ALL TYPES OF SKATERS - Urban, fitness, commuting and recreational skaters wanting a very versatile product. This skate has upgraded fit features and performance, support and style with the sublimated liner.
  • MEMORY BUCKLE CLOSURE SYSTEM - with additional lacing is extremely easy to use. The buckles are micro adjustable and have additional connection points on the internal side of the skate to help get the custom precise fit. Closure can be specific for cuff and ankle.
  • MOLDED SHELL SUPPORT WITH VENTILATION - support for all types of skating, enhances power transfer and a locked in feel. This, in combination with the ventilation, keeps your feet cooler on those hot days.
  • PADDED LINER with SHOCK ABSORBER & FOOTBOARD SIZER - Provides superior comfort with anatomical design, fit and sublimated liner. The Footboard sizer allows you to create a snug fit or remove it to make more room in the skate. The heel shock absorber provides great vibration dampening while skating.
  • ROLLERBLADE HYDROGEN SE WHEELS- 90mm/85A wheels add more speed and less friction. SG9 bearing spin is superior and enables speed while connected to the responsive 4x90 extruded alu frame for a great balance of speed and control.

Release Date: 15-02-2024

model number: 073725009U1

Part Number: 073725009U1

Details: Imagine skating in ultimate support and comfort. From its street-ready style to its ultra-responsive performance, the Lightning 90 will be your go-to skate. This skate offers support with its molded shell construction combined with an easy closure system and memory buckles to get the exact fit in the cuff and instep areas. The comfortable liner with Footboard Sizer allows for a custom fit that provides two sizes in one skate. It enables skaters to insert the Footboard under the insole to create a snugger, more performance fit or remove it to accommodate the bigger size for more room in their skates. The 90mm wheels provide the ideal mix of speed and control, great for going fast and being more forgiving over small debris. From commuting to work, crushing personal goals, to weaving your way through streets, this skate offers great performance.

EAN: 0888341987033

Package Dimensions: 23.5 x 16.0 x 5.5 inches

View full details